File #: 2018-330    Version: 1 Name:
Type: Staff Report Status: Passed
File created: 8/20/2018 In control: City Council Special Meeting
On agenda: 8/29/2018 Final action: 8/29/2018
Title: Fountain of Life Soft Surface Replacement

City Council

 

MEETING DATE: 8/29/2018                                                                                                                              

TITLE:

Title

Fountain of Life Soft Surface Replacement

End

 

FROM:                                          

Tami Scott, Administrative Services Director

 

RECOMMENDATION:                     

Recommendation                     

Staff recommends the City Council authorize replacement of the soft surface material located in Town Square at the Fountain of Life in an amount not to exceed $59,013.

Body

 

 

BACKGROUND:

The Fountain of Life soft surface lifespan is generally every two to three years depending on a variety of factors.  The combination of heat, water and the pH factor of the chlorination for health and safety purposes along with the increased use makes it extremely challenging to maintain the soft surface for longer than this.  In addition, because of these impediments, it is difficult to obtain interested parties to submit bids.

 

 

DISCUSSION:

Due to the unexpected accelerated deterioration of the surface due to the extreme factors outlined above, after discussion and inspection from several potential vendors, staff has been able to secure two bids for the re-surfacing of which one was insufficient.  At this time, staff is recommending moving forward with Park Pet and Play, LLC. in an amount not to exceed $59,013.  The renovation will include onsite removal and reinstallation of the soft surface material, inspection of the drainage system and proper disposal of the waste material.  It will include resurfacing both the inner and outer surfaces.

 

 

FISCAL IMPACT:

A General Fund budget amendment is required - Account Number 100-8112-8301.

 

 

ATTACHMENTS:

None