Legislation Details

File #: 2018-62    Version: 1 Name:
Type: Informational Report Status: Agenda Ready
File created: 2/26/2018 In control: Planning Commission
On agenda: 3/7/2018 Final action:
Title: CASE NO. Conditional Use Permit No. 17-032 APPLICANT: Lost Horse Supply Co., LLC, Jeffrey Miller LOCATION: 68364 Commercial Road (APN: 687-312-011) REQUEST: Consider a Conditional Use Permit application to operate a cannabis business (manufacturing and distribution and transportation site) within an existing commercial building in the CBP-2 (Commercial Business Park) Zoning District located at 68364 Commercial Road.
Attachments: 1. Attachment 1- Conditions of Approval, 2. Attachment No. 2 - Site Plan, 3. Attachment No. 3 - Floor Plan, 4. Attachment No. 4 - Colored Elevations, 5. Attachment No. 5 - Landscape Plan, 6. Attachment No. 6 - Distribution/Transportation License, 7. Attachment No. 7 - Manufacturing License, 8. Attachment No. 8 - Public Hearing Notice, 9. Attachment No. 9 - CCFD Guidelines for Medical Cannabis (Manufacturing)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Planning Commission

 

MEETING DATE: 3/7/2018                                                                                                                              

Title

CASE NO. Conditional Use Permit No. 17-032

 

APPLICANT: Lost Horse Supply Co., LLC, Jeffrey Miller

 

LOCATION: 68364 Commercial Road (APN: 687-312-011)

 

REQUEST: Consider a Conditional Use Permit application to operate a cannabis business (manufacturing and distribution and transportation site) within an existing commercial building in the CBP-2 (Commercial Business Park) Zoning District located at 68364 Commercial Road.

End

 

STAFF PLANNER:                                          

Salvador Quintanilla, Associate Planner

 

RECOMMENDATION:

Recommendation                     

APPROVE an exemption to the California Environmental Quality Act (CEQA) pursuant to Section No. 15301, Class No. 1 (Existing Facilities).

 

APPROVE Conditional Use Permit No. 17-032 subject to the attached Conditions of Approval and based on the findings contained in the staff report.

Body

 

FINDINGS:

APPROVAL OF AN EXEMPTION TO CEQA based on the findings, the project qualifies as Categorically Exempt under Section No. 15301, Class No. 1 (Existing Facilities) of the State CEQA Guidelines.

 

APPROVAL OF CONDITIONAL USE PERMIT NO. 17-032, subject to the attached conditions of approval, and based on the following findings:

 

1. The cannabis business to be located at 68364 Commercial Road, in the CBP-2 Zoning District is authorized as a conditional use per the City of Cathedral City Zoning Ordinance, Chapter 9.36.

 

2. The cannabis business as well as all operations as conducted therein, fully complies with all applicable building, electrical, zoning and fire codes, accessibility requirements of the Americans with Disabilities Act (ADA), and all relevant City and State Law. Staff has reviewed the site and floor plans submitted and determined that, as conditioned herein, the cannabis business will comply with all relevant building codes, zoning, and the ADA.

 

3. The cannabis business fully complies with and meets all operating criteria required pursuant to State Laws, Chapter 5.88 of the City Municipal Code (CCMC), any other provisions of the CCMC, and any specific, additional operating procedures and measures as may be imposed as conditions of approval in this in this conditional use permit. The applicant has been granted local licenses (MCL No. 17-026) in accordance with Chapter 5.88 of the CCMC, and in granting the local license the City Manager determined that the cannabis business was in compliance with all applicable laws regarding the operation of the business.

 

4. The cannabis business is necessary or desirable for the development of the community, is in harmony with the various elements or objectives of the general plan, and is not detrimental to existing uses or to uses specifically permitted in the zone in which the proposed use is to be located. By allowing cannabis businesses in certain zones, the City Council has determined that cannabis businesses are necessary and desirable for the development of the community, is consistent with the general plan, and will not be detrimental to other uses in the zones.

 

5. The site for the cannabis business is adequate in size and shape to accommodate such use and any and all of the yards setbacks and walls or fences, landscaping and other features required in order to adjust such use to those existing or permitted future uses on land in the neighborhood. The cannabis business meets all site development standards.

 

6. The site for the cannabis business relates properly to streets and highways which are designed and improved to carry the type and quantity of traffic generated or to be generated by the proposed use. The cannabis business primary collector street is East Palm Canyon Drive, which has adequate capacity to serve the limited traffic that will be generated by the use.

 

7. The applicant agrees to comply with any and all of the conditions imposed by the Planning Commission or be subjected to a revocation hearing.

 

 

BACKGROUND:

City ordinances allow for the establishment of cannabis businesses (dispensaries, cultivation, distribution/transportation and manufacturing sites) within certain zoning districts of the City, subject to a Conditional Use Permit (CUP). The ordinances regulating cannabis businesses are codified at CCMC Chapters 5.88 and 9.108 (the “Ordinance”).

Under the ordinance, cannabis businesses are required to obtain both a cannabis license (local license) and CUP. For the local license, applicants are required to submit various documents such as the ownership structure of the cannabis business, a general description of the products and services to be provided and security and delivery plans. In addition, all owners, directors, officers and persons who are managing or otherwise responsible for the activities of a proposed cannabis business must submit to a background check. The City Manager, or his designee, shall decide whether to approve or deny a local license application.

A Local License application for manufacturing and distribution/transportation was submitted on August 22, 2017. The CUP was submitted on August 29, 2017. The Local License application was reviewed by staff including the Police Department, the background check completed and the manufacturing and distribution/transportation licenses were granted on October 25, 2017 (see Attachment 6 and 7).

The Architectural Review Committee (ARC) reviewed the project on February 21, 2018 and approved the project to move forward to the Planning Commission with a vote of 4-0, incorporating the following comments and revisions:

1. Revise the proposed building color scheme to three different shades of gray.

2. Consider an art piece (for your logo) within the landscape area.

3. Remove the Joshua tree as it will not grow in Cathedral City.

4. Provide additional landscaping in the front (south side) landscape area.

The changes were incorporated into the site plan, elevations, landscape plan prior to the Planning Commission meeting. The Planning Commission will take final action on this matter unless it is appealed to the City Council.

 

 

ANALYSIS:

The project site is located within the CBP-2 (Commercial Business Park) Zoning District. The surrounding uses include automotive repair, commercial service uses, a RV dealership, and other cannabis businesses. Pursuant to CCMC section 9.108.090, a combined manufacturing and distribution/transportation site may only be located within the I-1 (Light Industrial) or CBP-2 (Commercial Business Park) zoning districts.

Furthermore, no manufacturing and distribution/transportation site shall be located: a) within six-hundred (600) feet of a school, day care center, or youth center; b) within three hundred (300) feet of a residential zone, or c) within two hundred and fifty (250) feet of East Palm Canyon Drive. Staff has confirmed that the subject location does not violate any of the applicable location restrictions set forth in the CCMC.

The site is licensed for manufacturing and distribution/transportation. The extraction equipment will be CO2 based and located within a separate room. The Fire Department has reviewed the proposal and approved the conceptual plan subject to the formal review and approval of a plan check submittal which shall comply with the requirements and standards contained in the Cannabis Extraction for Commercial Manufacturing Facilities section of the Fire Department Development Guidelines (see Attachment 9).

The existing building is approximately 7,676 square feet and will be compromised of 3,079 square feet of manufacturing, 717 square feet of distribution/transportation, and approximately 3,880 square feet for an office and employee lounge, an audio/video room, storage, an electrical room, a bathroom and other ancillary space.

There are a number of improvements proposed to the site including the addition of a new handicap space, a new trash enclosure, renovation of the existing landscaping, a new sidewalk, a loading area, and repaving and restriping of the parking areas. 

As recommended by the Architectural Review Committee, the building will be repainted with three different shades of gray; a light gray as the base color, accented by the medium and dark gray along the upper portion of the building. A metal screen will be installed on the roof to screen the mechanical equipment from the public right-of-way. The storefront frame and glass are not proposed to be changed.

 

ENVIRONMENTAL ANALYSIS:

Categorical Exemption under Section No. 15301, Class No. 1 (Existing Facilities) of the State CEQA Guidelines, which allows tenant improvements in existing buildings to be exempt. Since there is no outside expansion, this qualifies for a Class No. 1 Exemption.

NOTE: The City of Cathedral City Planning Department is custodian of the documents or other material, which constitute the record of proceedings upon this decision is based.

 

PUBLIC NOTIFICATION:

This project and the environmental determination were noticed in accordance with the City Municipal Code and CEQA (see Attachment 8).

 

ATTACHMENTS:

Attachment 1:                     Conditions of Approval

Attachment 2:                     Site Plan

Attachment 3:                     Floor Plan

Attachment 4:                     Colored Elevations

Attachment 5:                     Landscape Plan

Attachment 6:                     Local License Distribution/Transportation

Attachment 7:                     Local License Manufacturing

Attachment 8:                     Public Hearing Notice

Attachment 9:                     Cathedral City Fire Department Guidelines