File #: 2016-156    Version: 1 Name:
Type: Resolution Status: Action Items
File created: 4/18/2016 In control: City Council
On agenda: 4/27/2016 Final action:
Title: Annual Renewal of the Lighting and Landscaping District Budget
Attachments: 1. FY1617 - Cathedral City - Initiate Proceedings Resolution, 2. FY1617 - Cathedral City - Intention to Levy Resolution, 3. FY1617 - Cathedral City - Preliminary Engineers Report Resolution, 4. FY1617 - Cathedral City - Preliminary Engineers Report

City Council

 

MEETING DATE: 4/27/2016                                                                                                                              

TITLE:

Title

Annual Renewal of the Lighting and Landscaping District Budget

End

 

FROM:                                          

Tami Scott, Administrative Services Director

 

RECOMMENDATION:                     

Recommendation                     

Staff recommends the City Council approve and adopt three Resolutions to renew the annual assessments with Street Lighting and Landscape Maintenance District No. 1 (Zones 1 through 54). These resolutions include: 1. Resolution Initiating Proceedings; 2. Resolution of Intention to Levy and Collect Assessments; and 3. Resolution Approving the Preliminary Engineer’s Report.

Body

 

 

BACKGROUND:

In August 2001, City Council adopted Res. 2001-57 which approved the formation of an assessment district created under the Street Landscaping and Lighting Maintenance District Act of 1972.  The original district was initiated with six proposed benefit zones, but after the required Proposition 218 ballot process, only four Benefit Zones were approved.  Since the initial formation, annexations of additional zones have been approved by City Council, and passed by property owners through the Proposition 218 ballot process, making a total of sixteen (16) current zones (Zones 1 thru 54, non-sequential) to date.

The 1972 Act provides that assessments may be levied annually.  Proposition 218 laws provide assessment increase limitations.  Assessments for labor, material and utility increases cannot exceed an amount greater than the Consumer Price Index (CPI) for the previous year. Re-balloting is required if increases exceed the CPI limitations or if the scope of work accomplished by the LLD Zone were to change.  Under the preliminary Engineer’s Report, there are no LLD Zone levy increases exceeding the CPI limitation as currently proposed.

 

 

DISCUSSION:

The prescribed process includes the City Council adopting resolutions as stated in the recommendation above.  To meet the time requirements to levy the parcels for the 2016-2017 tax year, the Resolutions need to be approved on April 27, 2016.  A Public Hearing will be scheduled on May 25, 2016, duly published and made available at least 10 days prior to the Public Hearing.  The Final Engineer’s Report and Levy for LLD Zones 1 through 54 (non-sequential) will be presented at the May 25th meeting. At that time, the Council may pass a Resolution Approving the Engineer’s Report and a Resolution regarding the Establishment of the Maximum Assessment and Ordering the Levy and Collection of the Assessment.

 

 

FISCAL IMPACT:

Final acceptance of the Engineer’s Report and the Resolution Ordering the Levy and Collection of Assessment will allow the City to collect the appropriate levies from the parcel owners for these 16 LLD zones.  Two of these LLD zones provide for a 50% contribution from the City’s general fund for the maintenance of a public park (Century Park and Panorama Park).

 

 

ATTACHMENTS:

Resolution to Initiate Proceedings

Resolution for Intention to Levy

Resolution for Preliminary Engineers Report

Preliminary Engineers Report